Project carried out within the scope of the KOSGEB Strategic Product Support Program for the domestic development of pla
Project conducted under the BEBKA support program in the field of aviation and rail systems.
Half-height platform screen door (PSD) systems were installed at 4 stations of the Minsk Metro, covering 160 doors. The
Platform screen door systems supplied for the Kabatas-Mahmutbey-Mecidiyekoy metro line operated by Metro Istanbul.
Platform screen door application for the Vadistanbul line in cooperation with BARTHOLET.
Half-height platform screen door (PSD) installation at the tram stops of the ESTRAM line operated by Eskisehir Metropoli