We provide safe and modern solutions for the growing transportation needs of cities. PSD (Platform Screen Door) systems separate the platform from the vehicle on tram and metro lines, maximising passenger safety.
We run the entire process in-house, from needs analysis to commissioning. We manufacture domestically in our certified facilities with designs from our own R&D unit.
Separating the passenger waiting area and rail line in the platform, Preventing the contact of the passenger waiting in the platform with the vehicle in motion, It has safety functions that will prevent the passenger fro…
It is generally applied in street tram or rail system stations where thermal comfort does not come to the fore. Application at hei…
Application at heights between 170cm~230cm Application in open stations, tunnel stations and viaduct stations Increased passenger …
Closing up to the ceiling (230 cm~) It is generally used in subway lines where thermal comfort and exposure to metal dust coming f…
We manufacture on a total area of 7,500 m² in the Organised Industrial Zone — 4,500 m² indoor and 3,000 m² outdoor.
As ALDOOR door systems we have installed a total of 2,256 doors to date, operating 24/7.
With our in-house R&D unit we have reached 87% domestic content in design, production and installation of PSD systems.
14.03.2021
We have received the CE Certificate for ALPSD-1000, our platform screen door system.
10.02.2021
In his meeting with the Minister of Transport and Infrastructure Adil Karaismailoğlu, our General Manager Gürhan Albayrak conveyed Eskişehir's requests regarding rail systems and ring roads.
21.11.2020
Our General Manager Gürhan Albayrak explained the Green Road Project to Ayhan Aydıner, Editor-in-Chief of Haberes.